North Aston Hall

Work carried out

  • Full removal and installation
  • Reclaimed Welsh slating
  • Bespoke batten scheduling & slate cutting
  • Wood-rolled lead detailing

Thoughts & feedback

There were several roof elevations that underwent a full removal and installation to suit the architect’s specification.

We were instructed to use a reclaimed welsh slate with a hint of purple, the slates also had to diminish in sizes which meant a bespoke batten schedule was made to suit each elevation and the welsh slates had to be cut to size to suit.

A wood rolled lead detail has been installed to the ridge line and hips which has given each elevation a clean neat finish.

Gallery